RM 880,000
This property features 3-storey townhouses of various sizes and layouts. Units are available in corner, end, and intermediate types. The houses will be completed in August 2025. Key features of the property include reinforced concrete frames, brick walls with cement plaster, concrete roof tiles, and steel roof frames. Interior walls are finished with plaster and paint, while exterior walls have weatherproof paint. The units have tiled floors and aluminum-framed glass windows. Electrical points are provided for lighting, power sockets, kitchen appliances, and other needs. Sanitary fittings include water closets, wash basins, showers, kitchen sinks, and water tanks. Telephone and fiber optic sockets are also available.
📍

GENERAL SUPREME SDN. BHD.
Developer