



RM 255,000
3
Bedrooms
2 bath
Bathrooms
n/a
Size
Freehold
Tenure
units of terraced homes are expected to be completed in October . The property is freehold and is located in a Malay Reserved Area. The homes will feature tiled floors in the living room, dining room, bedrooms, kitchen, and bathrooms. The walls will be finished with ceramic tiles up to feet high in the bathrooms and cement plaster in other areas. The ceiling will be made of plaster in the living room, dining room, and kitchen. The electrical fittings include power points, ceiling fan points, A sockets, ceiling lamp points, single-way swi
RIA LESTARI DEVELOPMENT SDN. BHD.
RIA LESTARI DEVELOPMENT SDN. BHD.
RIA LESTARI DEVELOPMENT SDN. BHD.
RIA LESTARI DEVELOPMENT SDN. BHD.